Polymer Flooring Systems for Concrete Joint Report on Polymer Flooring Systems for Concrete by SSPC, ICRI and NACE This SSPC: The Society for Protective Coatings (SSPC)/International Concrete Repair Institute (ICRI)/NACE International (NACE) report represents a consensus of those individual members who have reviewed this document, its scope, and provisions. Its
Read More »
Rust Protection News
Standard Procedure for Evaluating Qualifications of Shop Painting Applicators
What are Shop Painting Applicators? Qualification Procedure No. 3 – Standard Procedure for Evaluating Qualifications of Shop Painting Applicators 1. Scope 1.1 This standard procedure describes a method for evaluating the qualification of shop painting applicators whose primary function is to provide surface preparation and protective coating application services. However, the
Read More »
Standard Procedure for the Qualification of Painting Contractors
Field Removal of Hazardous Coatings from Complex Structures Painting Contractors Qualification Procedure No. 2 – Standard Procedure for the Qualification of Painting Contractors 1. Scope 1.1 This standard procedure describes a method for evaluating the qualifications of industrial field painting contractors to remove hazardous coatings (e.g., coatings containing lead or
Read More »
Procedure for Evaluating the Qualifications of Industrial/Marine Painting Contractors
What is the Standard Procedure for Evaluating the Qualifications of Industrial/Marine Painting Contractors? Field Application for Painting Contractors to Complex Industrial and Marine Steel Structures 1. Scope 1.1 This procedure describes a method for evaluating the primary qualifications of industrial/marine painting contractors and defines a minimum standard for qualification. 1.2
Read More »
Standard Procedure for Evaluating A Contractor’s Advanced Quality Management System
What is a Contractor? Quality System No. 1 – Standard Procedure for Evaluating A Contractor’s Advanced Quality Management System 1. SCOPE 1.1 SSPC-QS 1 requires that a contractor implement and document more stringent quality control and record keeping procedures than those included in the requirements of standards such as SSPC-QP
Read More »
Procedure for Evaluating Painting Contractors With Limited Industrial Work Experience
Evaluation of Painting Contractors With Limited Industrial Work Experience Qualification Procedure No. 7 – Procedure for Evaluating Painting Contractors With Limited Industrial Work Experience 1. Scope 1.1 The procedure describes a method for evaluating the qualifications of field painting contractors and contracting firms with less than 6 months industrial painting
Read More »
