• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

Rust Bullet Australasia

Aluminium based rust inhibitor and corrosion cure protective coating

Rust Bullet Australasia

Stephen : 0415 168 902
Email: info@rustbullet.com.au

  • HOME
    • Rust Bullet Best Rust Prevention Paint Australasia
    • Rust Bullet Automotive
    • Black Shell
  • RUST BULLET ADVANTAGE
    • Cost of Corrosion
    • Why Rust Bullet
  • SHOP
  • VIDEOS
    • Applying Rust Bullet
    • Rust Bullet Presentations
    • Rust Bullet Demonstrations
  • PROJECTS
    • Automotive
    • Home & Farm
    • Industrial
    • Marine
    • Concrete
  • TECH
    • Application Guidelines
    • Coating Failures
    • How it Works
    • Lab Tests
    • MSDS & Data
    • Product Comparisons
  • CONTACT
  • FAQ
  • NEWS
  • 0 items$0.00
You are here: Home / Technical / SSPC: The Society for Protective Coatings / Surface Preparation / Surface Preparation of Concrete

Surface Preparation of Concrete

Rust Bullet

What are the Surface Preparation for Concrete?

Joint Surface Preparation Standard SSPC-SP 13/NACE NO.06 – Surface Preparation of Concrete

This SSPC: The Society for Protective Coatings/NACE International (NACE) standard represents a consensus of those individual members who have reviewed this document, its scope, and provisions.  It is intended to aid the manufacturer, the consumer, and the general public.  Its acceptance does not in any respect preclude anyone, whether he has adopted the standard or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not addressed in this standard.  Nothing contained in this SSPC/NACE standard is to be construed as granting any right, by implication or otherwise, to manufacture, sell, or use in connection with any method, apparatus, or product covered by Letters Patent, or as indemnifying or protecting anyone against liability for infringement of Letters Patent. This standard represents current technology and should in no way be interpreted as a restriction on the use of better procedures or materials. Neither is this standard intended to apply in all cases relating to the subject. Unpredictable circumstances may negate the usefulness of this standard in specific instances.  SSPC and NACE assume no responsibility for the interpretation or use of this standard by other parties and accept responsibility for only those official interpretations issued by SSPC or NACE in accordance with their governing procedures and policies which preclude the issuance of interpretations by individual volunteers.

Users of this SSPC/NACE standard are responsible for reviewing appropriate health, safety, environmental, and regulatory documents and for determining their applicability in relation to this standard prior to its use.  This SSPC/NACE standard may not necessarily address all potential health and safety problems or environmental hazards associated with the use of materials, equipment, and/or operations detailed or referred to within this standard.  Users of this SSPC/NACE standard are also responsible for establishing appropriate health, safety, and environmental protection practices, in consultation with appropriate regulatory authorities if necessary, to achieve compliance with any existing applicable regulatory requirements prior to the use of this standard.

CAUTIONARY NOTICE:  SSPC/NACE standards are subject to periodic review, and may be revised or withdrawn at any time without prior notice.  The user is cautioned to obtain the latest edition.  SSPC and NACE require that action be taken to reaffirm, revise, or withdraw this standard no later than five years from the date of initial publication.

Reaffirmed 2003-03-17 Approved 1997
©2003, SSPC: The Society for Protective Coatings and NACE International
___________________________________________________________________________

Foreword

This standard covers the preparation of concrete surfaces prior to the application of protective coating or lining systems. This standard should be used by specifiers, applicators, inspectors, and others who are responsible for defining a standard degree of cleanliness, strength, profile, and dryness of prepared concrete surfaces.

This standard was originally prepared in 1997 by SSPC/NACE Joint Task Group F on Surface Preparation of Concrete.  It was reaffirmed in 2003 by SSPC Group Committee C.2 on Surface Preparation and NACE Specific Technology Group 04 on Protective Coatings and Linings— Surface Preparation. This standard is issued by SSPC Group Committee C.2 and by NACE International under the auspices of STG 04.

Section 1:  General

1.1 This standard gives requirements for surface prepara­tion of concrete by mechanical, chemical, or thermal meth­ods prior to the application of bonded protective coating or lining systems.
1.2 The requirements of this standard are applicable to all types of cementitious surfaces including cast-in-place con­crete floors and walls, precast slabs, masonry walls, and shotcrete surfaces.
1.3 An acceptable prepared concrete surface should be free of contaminants, laitance, loosely adhering concrete, and dust, and should provide a sound, uniform substrate suitable for the application of protective coating or lining systems.
1.4 When required, a minimum concrete surface strength, maximum surface moisture content, and surface profile range should be specified in the procurement documents (project specifications).
1.5 The mandatory requirements of this standard are given in Sections 1 to 7 as follows:
Section 1: General
Section 2: Definitions
Section 3: Inspection
Section 4: Procedures Prior to Surface Preparation
Section 5: Surface Preparation
Section 6: Inspection and Classification of Prepared Concrete Surfaces Acceptance Criteria
Section 7: Safety and Environmental Requirements

1.6 Appendix A does not contain mandatory requirements.
________________________________________________________________________

Section 2:  Definitions

Coating: See Protective Coating or Lining System.
Concrete: A material made from hydraulic cement and inert aggregates, such as sand and gravel, which is mixed with water to a workable consistency and placed by various methods to harden and gain strength.
Curing (Concrete): Action taken to maintain moisture and temperature conditions in a freshly placed cementitious mix­ture to allow hydraulic cement hydration so that potential properties of the mixture may develop.
Curing Compound (Membrane Curing Compound): A liquid that can be applied as a coating to the surface of newly placed concrete to retard the loss of water.1
Efflorescence: A white crystalline or powdery deposit on the surface of concrete.  Efflorescence results from leaching of lime or calcium hydroxide out of a permeable concrete mass over time by water, followed by reaction with carbon dioxide and acidic pollutants.2
Fin: A narrow linear projection on a formed concrete sur­face, resulting from mortar flowing into spaces in the form work.
Finish: The texture of a surface after consolidating and fin­ishing operations have been performed.1
Finishing:  Leveling, smoothing, consolidating, and other­wise treating surfaces of fresh or recently placed concrete or mortar to produce desired appearance and service.1
Hardener (Concrete): A chemical (including certain fluoro­silicates or sodium silicate) applied to concrete floors to reduce wear and dusting.1
High-Pressure Water Cleaning (HP WC): Water cleaning performed at pressures from 34 to 70 MPa (5,000 to 10,000 psig).3
High-Pressure Waterjetting (HP WJ): Waterjetting per­formed at pressures from 70 to 210 MPa (10,000 to 30,000 psig).3
Honeycomb: Voids left in concrete due to failure of the mortar to effectively fill the spaces among coarse aggregate particles.1
Laitance:  A thin, weak, brittle layer of cement and aggre­gate fines on a concrete surface.  The amount of laitance is influenced by the type and amount of admixtures, the de­gree of working, and the amount of water in the concrete.2
Lining: See Protective Coating or Lining System.
Placing: The deposition, distribution, and consolidation of freshly mixed concrete in the place where it is to harden.1
Porosity:  Small voids that allow fluids to penetrate an otherwise impervious material.
Protective Coating or Lining System (Coating):  For the purposes of this standard, protective coating or lining sys­tems (also called protective barrier systems) are bonded thermoset, thermoplastic, inorganic, organic/inorganic hy­brids, or metallic materials applied in one or more layers by various methods such as brush, roller, trowel, spray, and thermal spray.  They are used to protect concrete from degradation by chemicals, abrasion, physical damage, and the subsequent loss of structural integrity.  Other potential functions include containing chemicals, preventing staining of concrete, and preventing liquids from being contaminated by concrete.
Release Agents (Form-Release Agents):  Materials used to prevent bonding of concrete to a surface.1
Sealer (Sealing Compound):  A liquid that is applied as a coating to a concrete surface to prevent or decrease the penetration of liquid or gaseous media during exposure. Some curing compounds also function as sealers.
Soundness:  A qualitative measure of the suitability of the concrete to perform as a solid substrate or base for a coat­ing or patching material.  Sound concrete substrates usually exhibit strength and cohesiveness without excessive voids or cracks.
Spalling (Concrete)
:  The development of spalls which are fragments, usually in the shape of a flake, detached from a larger mass by a blow, by the action of weather, by pres­sure, or by expansion within the larger mass.1
Surface Porosity: Porosity or permeability at the concrete surface that may absorb vapors, moisture, chemicals, and coating liquids.
Surface Preparation:  The method or combination of meth­ods used to clean a concrete surface, remove loose and weak materials and contaminants from the surface, repair the surface, and roughen the surface to promote adhesion of a protective coating or lining system.
Surface Profile (Texture): Surface contour as viewed from edge.
Surface Air Voids: Cavities visible on the surface of a solid.

Section 3:  Inspection Procedures Prior to Surface Preparation

3.1 Concrete shall be inspected prior to surface prepara­tion to determine the condition of the concrete and to deter­mine the appropriate method or combination of methods to be used for surface preparation to meet the requirements of the coating system to be applied.  Inherent variations in sur­face conditions seen in walls and ceilings versus those in floors should be considered when choosing surface prepar­ation methods and techniques. For example, walls and ceil­ings are much more likely than floors to contain surface air voids, fins, form-release agents, and honeycombs.
3.2 Visual Inspection
All concrete surfaces to be prepared and coated shall be visually inspected for signs of concrete defects, physical damage, chemical damage, contamination, and excess moisture.
3.3 Concrete Cure
All concrete should be cured using the procedures de­scribed in ACI(1) 308.4 Curing requirements include main­taining sufficient moisture and temperatures for a minimum time period.  Surface preparation performed on insufficiently cured or low-strength concrete may create an excessively coarse surface profile or remove an excessive amount of concrete. (1)
3.4 Concrete Defects
Concrete defects such as honeycombs and spalling shall be repaired.  The procedures described in NACE Standard
5(2)67 RP0390, ICRI 03730, or ACI 301 may be used to en­sure that the concrete surface is sound prior to surface preparation.
3.5 Physical Damage
3.5.1 Concrete should be tested for soundness by the qualitative methods described in NACE Publication 6G1918 or Paragraph A1.4.3.
3.5.2 When qualitative results are indeterminate, or when a quantitative result is specified, concrete shall be tested for surface tensile strength using the meth­ods described in Paragraph A1.6.
3.5.3 Concrete that has been damaged because of physical forces such as impact, abrasion, or corrosion of reinforcement shall be repaired prior to surface prep­aration if the damage would affect coating perform­ance. Repairs should be made in accordance with ACI 301,7 NACE Standard RP0390,5 or Paragraph A1.4.
3.6 Chemical Damage
3.6.1 Concrete is attacked by a variety of chemicals,  as detailed in ACI 515.1Rand PCA IS001.

3.6.2 All concrete surfaces that have been exposed to chemicals shall be tested and treated for contamination as described in Paragraph 3.7.
3.6.3 Concrete that has been exposed to chemicals shall be tested for soundness by the qualitative meth­ods described in NACE Publication 6G191 or Para­graph A1.4.3.
3.7 Contamination
3.7.1 Contamination on concrete surfaces includes all materials that may affect the adhesion and perform­ance of the coating to be applied.  Examples include, but are not limited to, dirt, oil, grease, chemicals, and existing incompatible coatings.
3.7.2 Contamination may be detected by methods de­scribed in NACE Publication 6G1918 and Paragraph A1.5.  These methods include, but are not limited to, visual examination, water drop (contact angle) meas­urement, pH testing, petrographic examination, and various instrumental analytical methods.  Core samp­ling may be required to determine the depth to which the contaminant has penetrated the concrete.
3.7.3 Concrete surfaces that are contaminated or that have existing coatings shall be tested by the method described in Paragraph A1.6.3 to determine whether the contamination or existing coating affects the ad­hesion and performance of the coating to be applied. Concrete surfaces that have existing coatings shall also be tested by the method described in Paragraph A1.6.3 to determine whether the existing coating is sufficiently bonded to the concrete.
3.7.4 In extreme cases of concrete damage or degra­dation, or thorough penetration by contaminants, com­plete removal and replacement of the concrete may be required in the surface preparation.
3.8 Moisture

Moisture levels in the concrete may be determined by the methods described in Paragraph 5.6.

Section 4:  Surface Preparation

4.1 Objectives
4.1.1 The objective of surface preparation is to pro­duce a concrete surface that is suitable for application and adhesion of the specified protective coating sys­tem.
4.1.2 Protrusions such as from burrs, sharp edges, fins, and concrete spatter shall be removed during sur­face preparation.
4.1.3 Voids and other defects that are at or near the surface shall be exposed during surface preparation.
4.1.4 All concrete that is not sound shall be removed so that only sound concrete remains.
4.1.5 Concrete damaged by exposure to chemicals shall be removed so that only sound concrete remains.
4.1.6 All contamination, form-release agents, efflor­escence, curing compounds, and existing coatings determined to be incompatible with the coating to be applied shall be removed.
4.1.7 The surface preparation method, or combination of methods, should be chosen based on the condition of the concrete and the requirements of the coating system to be applied.
4.1.8 All prepared concrete surfaces shall be repaired to the level required by the coating system in the in­tended service condition.
4.2 Surface Cleaning Methods
4.2.1 The surface cleaning methods described in Par­agraphs 4.2.2 and 4.2.3 shall not be used as the sole surface preparation method of concrete to be coated as they do not remove laitance or contaminants or alter the surface profile of concrete.  These methods shall be used as required, before and/or after the mechan­ical and chemical methods described in Paragraphs 4.3 and 4.4.
4.2.2 Vacuum cleaning, air blast cleaning, and water cleaning as described in ASTM D 4258may be used to remove dirt, loose material, and/or dust from concrete.
4.2.3 Detergent water cleaning and steam cleaning as described in ASTM D 425811 may be used to remove oils and grease from concrete.
4.3 Mechanical Surface Preparation Methods
4.3.1 Dry abrasive blasting, wet abrasive blasting, vac­uum-assisted abrasive blasting, and centrifugal shot blasting, as described in ASTM D 4259,12 may be used to remove contaminants, laitance, and weak concrete, to expose subsurface voids, and to produce a sound concrete surface with adequate profile and surface porosity.
4.3.2 High-pressure water cleaning or waterjetting methods as described in SSPC-SP 12/NACE No. 5,2 ASTM D 4259,12 or “Recommended Practices for the Use of Manually Operated High Pressure Water Jetting Equipment,” may be used to remove contaminants, laitance, and weak concrete, to expose subsurface voids, and to produce a sound concrete surface with adequate profile and surface porosity.
4.3.3 Impact-tool methods may be used to remove existing coatings, laitance, and weak concrete.  These methods include scarifying, planing, scabbling, and rot­ary peening, as described in ASTM D 4259.12 Impact-tool methods may fracture concrete surfaces or cause micro-cracking and may need to be followed by one of the procedures in Paragraphs 4.3.1 or 4.3.2 to produce a sound concrete surface with adequate profile and surface porosity.  The soundness of a concrete surface prepared using an impact method may be verified by one of the surface tensile strength tests described in Paragraph A1.6.
4.3.4 Power-tool methods, including circular grinding, sanding, and wire brushing as described in ASTM D 4259,12 may be used to remove existing coatings, lait­ance, weak concrete, and protrusions in concrete. These methods may not produce the required surface profile and may require one of the procedures de­scribed in Paragraphs 4.3.1 or 4.3.2 to produce a con­crete surface with adequate profile and surface poro­sity.
4.3.5 Surface preparation using the methods de­scribed in Paragraphs 4.3.1 through 4.3.4 shall be per­formed in a manner that provides a uniform, sound sur­face that is suitable for the specified protective coating system.
4.4 Chemical Surface Preparation
Acid etching, as described in ASTM D 426014 and NACE Standard RP0892,15 may be used to remove laitance and weak concrete and to provide a surface profile on horizontal concrete surfaces.  This method requires complete removal of all reaction products and pH testing to ensure neutrali­zation of the acid.  Acid etching is not recommended for ver­tical surfaces and areas where curing compounds or seal­ers have been used. Acid etching shall only be used where procedures for handling, containment, and disposal of the hazardous materials are in place.  Acid etching with hydro­chloric acid shall not be used where corrosion of metal in the concrete (rebar or metal fibers) is likely to occur. (5)
4.5 Flame (Thermal) Cleaning and Blasting
4.5.1 Flame cleaning using a propane torch or other heat source may be used to extract organic contamin­ants from a concrete surface.  To remove the extracted contaminants this type of cleaning may need to be fol­lowed by the cleaning methods described in ASTM D 114258.
4.5.2 Flame cleaning and blasting using oxygen-acet­ylene flame blasting methods and proprietary delivery equipment may be used to remove existing coatings, contaminants, and laitance and/or create a surface pro­file on sound concrete.
4.5.3 The extent of removal when employing flame methods is affected by the rate of equipment advance­ment, the flame adjustment, and the distance between the flame and the concrete surface. Surface prepara­tion using flame methods shall be performed in a man­ner that provides a uniform, sound surface that is suit­able for the specified protective coating system.
4.5.4 High temperatures reduce the strength of or damage concrete; therefore, surfaces prepared using flame methods shall be tested for soundness and sur­face tensile strength. Concrete surfaces found to be unsound or low in tensile strength shall be repaired or prepared by other mechanical methods described in Paragraph 4.3.
4.6 Surface Cleanliness
After the concrete surface has been prepared to the required soundness and surface profile, surfaces may still need to be cleaned by one of the methods described in Paragraph 4.2 to remove the residue created by the surface preparation method or to remove spent media.
4.7 Moisture Content
If the moisture level in the concrete is higher than the spec­ified limit tolerable by the coating, the concrete shall be dried or allowed to dry to the level specified in the procure­ment documents before inspection and application of the coating (see Paragraph 5.6).
4.8 Patching and Repairs
4.8.1 Prior to proceeding with patching and repairs, the prepared concrete surface shall be inspected according to Section 5.  After the patching and repairs of the concrete surface are completed, the repaired areas shall be reinspected according to Section 5.
4.8.2 All gouges, surface air voids, and other surface anomalies shall be repaired to a level required by the coating system as specified in the procurement docu­ments.
4.8.3 All repair materials, both cementitious and poly­meric, should be approved or recommended by the coating manufacturer as being compatible with the coating to be applied.  Repair materials not recom­mended or approved by the coating manufacturer shall be tested for compatibility prior to their application.
4.8.4 The repair material shall be cured according to the manufacturer’s published instructions.
4.8.5 The repaired section may require additional sur­face preparation prior to coating application.

Section 5:  Inspection and Classification of Prepared Concrete Surfaces
5.1 Surface Tensile Strength
5.1.1 All prepared concrete surfaces should be tested for surface tensile strength after cleaning and drying but prior to making repairs or applying the coating.
5.1.2 Surface tensile strength should be tested using a method agreed upon by all parties. (See Paragraph A1.6 for commentary on these methods.)
5.2 Coating Adhesion
5.2.1 If specified in the procurement documents and accepted by all parties, a test patch shall be applied to determine the compatibility of and adhesion between the prepared surface and the coating system.  (See Paragraph A1.6.3 for commentary on this method.)
5.2.2 Coating adhesion should be tested using one of the methods agreed upon by all parties.  (See Para­graph A1.6 for commentary on these methods.)
5.3 Surface Profile
5.3.1 If a specific surface profile is required for the per­formance of the coating system to be applied, the pro­file shall be specified in the procurement documents.
5.3.2 The surface profile of prepared concrete sur­faces should be evaluated after cleaning and drying but prior to repairs or application of the coating.
5.3.3 The surface profile may be evaluated by com­paring the profile of the prepared concrete surface with the profile of graded abrasive paper, as described in (6)16
ANSI B 74.18, by comparing the profile with the ICRI Guideline No. 0373217 (surface profile chips), or by another agreed-upon visual comparison.
5.4 Surface Cleanliness
5.4.1 All prepared concrete surfaces shall be inspect­ed for surface cleanliness after cleaning and drying but prior to making repairs or applying the coating.  If the concrete surfaces are repaired, they shall be reinspect­ed for surface cleanliness prior to applying the coating.
5.4.2 Prepared concrete surfaces may be inspected for surface cleanliness by lightly rubbing the surface with a dark cloth or pressing a translucent adhesive tape on the surface.  The test method and acceptable level of residual dust shall be agreed on by all parties.
5.4.3 The method used to verify compatibility of the coating to be applied over a contaminated surface or over contaminated surfaces that have been cleaned and prepared should be approved by the coating man­ufacturer and specified in the procurement documents.

5.5 pH
5.5.1 If a specific pH range is required for proper per­formance of the coating system to be applied, the pH of the concrete shall be specified in the procurement doc­uments.
5.5.2 The pH of concrete surfaces prepared by acid etching should be tested after etching and rinsing but before the prepared surface has dried. 18
5.5.3 ASTM D 4262 should be used to determine pH.
5.6 Moisture Content
5.6.1 If a specific moisture content is required for pro­per performance of the coating system to be applied, the moisture content of the concrete shall be specified in the procurement documents.
5.6.2 Prepared concrete surfaces should be tested for residual moisture after cleaning and drying but prior to the application of the coating.
5.6.3 ASTM D 4263,19 ASTM F 1869,20 or ASTM F 21 2170 should be used to determine the residual moist­ure content in concrete.
5.6.4 If required or accepted by all parties, any of the methods described in Paragraph A1.8.4 may be used to determine the moisture content of the concrete sur­face.

Section 6:  Acceptance Criteria
6.1 The acceptance criteria for prepared concrete surfaces shall be specified in the procurement documents.
6.2 The procurement documents may refer to the specifi­cation

Section 7:  Safety and Environmental Requirements

7.1 Disposal of contaminants, old coatings, acid from etch fumes shall comply with all applicable facility, local, state and federal health and safety regulations.
7.2 Handling of hazardous materials, machinery operat­ing, and contaminated water and blasting media shall comply with all applicable facility, local, state, and federal regulations, worker protection, and control of airborne dust and –

Appendix A: Comments
(This section does not contain any mandatory requirements.)23,24,25,26
A1.1 General filled, patching or grouting materials are specified to repair or level the concrete surface.  See NACE Stand­ 1595ard RP0892, ACI 515.1R, NACE Standard RP0390,
A1.1.1 This standard does not recommend surface preparation methods or differentiate levels of surface SSPC-TU 2/NACE 6G197,27 and Paragraph A1.4.4 for preparation that are specifically required for various more information about patching materials. protective system designs, types, thicknesses, and end-use requirements.  These specifications should be A1.2 Concrete Finishing and Surface Characteristics23 decided and agreed upon by all parties (the specifier, facility owner, coating manufacturer, and contractor). A1.2.1 The method used to finish concrete surfaces affects the concrete’s surface profile, composition, por­A1.1.2 Concrete and its surfaces are not homogenosity, and density.  These surface properties affect the eous or consistent and, unlike steel, cannot be dis-adhesion and performance of concrete coatings.  Typi­cretely defined. Therefore, visual examination of a concrete surface is somewhat subjective. The acceptance finishing methods are given in Table A1. These prop-cal surface properties obtained using the most common -or rejection of a prepared concrete surface should be erties are evaluated prior to surface preparation. based on the results of specific tests, including, but not limited to, tests for surface tensile strength, contam-A1.2.2 No preferred method of finishing concrete to ination, and moisture. accept coatings has been established by the concrete coating industry. The surface cure, surface preparation A1.1.3 Joints, cracks, and curing shrinkage of con-method, and type of coating system to be applied are crete should be considered in the design of the protect-all factors in determining the suitability of any specific ive coating system; however, these topics are beyond concrete finishing method.  For example, broom finish-the scope of this standard.  See NACE Standard ing is sometimes used because it gives a profile for the RP0892, ACI 515.1R, and SSPC-TU 2/NACE coating; however, most of the profile may be removed 6G197 for more information.  during surface preparation if the surface is not properly cured, negating this inherent advantage of the broom A1.1.4 When a significant amount of weak, deterior-finish. When sacking is used to fill voids in formed con­ated, or contaminated concrete is removed during the crete surfaces, subsurface voids are created, and the course of surface preparation to achieve a sound sur-added cement is usually removed during surface prep-face, the profile of the remaining concrete is often too aration due to improper cure of the added cement rough for the intended coating system.  In these cases, paste. and where form voids and surface air voids must be

References

1. ACI 116R (latest revision), “Cement and Concrete     6. ICRI Guideline No. 03730 (latest revision), “Guide for

Terminology” (Farmington Hills, MI:      ACI). Surface Preparation for the Repair of Deteriorated Concrete Resulting from Reinforcing Steel Corrosion” (Des Plaines,

2. SSPC-Guide 11 (latest revision), “Guide for Coating IL: ICRI). Concrete” (Pittsburgh, PA:  SSPC).

7. ACI 301 (latest revision), “Specifications for Structural

3. SSPC-SP 12/NACE No. 5, “Surface Preparation and Concrete” (Farmington Hills, MI: ACI). Cleaning of Metals by Waterjetting Prior to Coating” (Pittsburgh, PA:  SSPC, and Houston, TX:  NACE). 8. NACE Publication 6G191 (withdrawn), “Surface Prep­aration of Contaminated Concrete for Corrosion Control”

4. ACI 308 (latest revision), “Standard Practice for Curing (Houston, TX:  NACE ). (Available from NACE as an Concrete” (Farmington Hills, MI:  ACI). historical document only).

5. NACE Standard RP0390 (latest revision), “Mainten-9. ACI 515.1R (latest revision), “Guide to the Use of ance and Rehabilitation Considerations for Corrosion Con-Waterproofing, Dampproofing, Protective, and Decorative trol of Existing Steel-Reinforced Concrete Structures” Barrier Systems for Concrete” (Farmington Hills, MI:  ACI). (Houston, TX:  NACE).

10. IS001 (latest revision), “Effects of substances on con­crete and guide to protective treatments” (Skokie, IL: PCA).

11. ASTM D 4258 (latest revision), “Standard Practice for Surface Cleaning Concrete for Coating” (West Consho­hocken, PA:  ASTM).

12. ASTM D 4259 (latest revision), “Standard Practice for Abrading Concrete” (West Conshohocken, PA:  ASTM).

13. “Recommended Practices for the Use of Manually Operated High-Pressure Water Jetting Equipment” (latest revision) (St. Louis, MO: WaterJet Technology Assoc­iation).

14. ASTM D 4260 (latest revision), “Standard Practice for Acid Etching Concrete” (West Conshohocken, PA:  ASTM).

15. NACE Standard RP0892 (latest revision), “Coatings and Linings Over Concrete for Chemical Immersion and Containment Service” (Houston, TX:  NACE).

16. ANSI B74.18 (latest revision), “Specifications for Grad­ing of Certain Abrasive Grain on Coated Abrasive Products” (Washington, DC:  ANSI).

17. ICRI Guideline No. 03732 (latest revision), “Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays” (Des Plaines, IL:  ICRI).

18. ASTM D 4262 (latest revision), “Standard Test Method for pH of Chemically Cleaned or Etched Concrete Surfaces” (West Conshohocken, PA:  ASTM).

19. ASTM D 4263 (latest revision), “Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method” (West Conshohocken, PA:  ASTM).

20. ASTM F 1869 (latest revision), “Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride” (West Con­shohocken, PA:  ASTM).

21. ASTM F 2170 (latest revision), “Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using In Situ Probes” (West Conshohocken, PA:  ASTM).

22. F.S. Gelfant, “Contaminated Concrete—Effect of Sur­face Preparation Methods on Coating Performance,” Jour­nal of Protective Coatings and Linings (JPCL) 12, 12 (1995):  pp. 60-72.

23. T.I. Aldinger, B.S. Fultz, “Keys to Successfully Prep­aring Concrete for Coating,” JPCL 6, 5 (1989): pp. 34-40.

24. T. Dudick, “Concrete Standards for Resinous Top­pings,” SSPC 93-06:  Innovations for Preserving and Pro­tecting Industrial Structures, November 13-18, 1993 (Pitts­burgh, PA:  SSPC, 1993).

25. R. Boyd, “Quality Control in Cleaning and Coating Con­crete,” SSPC 91-19:  Protective Coatings for Flooring and Other Concrete Surfaces, November 10-15, 1991 (Pitts­

burgh, PA: SSPC, 1991), pp. 5-7.

26. L.D. Vincent, Corrosion Prevention by Protective Coat­ings, 2nd ed. (Houston, TX:  NACE, 1999).

27. SSPC-TU 2/NACE 6G197 (latest revision), “Design, Installation, and Maintenance of Coating Systems for Con­crete Used in Secondary Containment,” (Pittsburgh, PA: SSPC, and Houston, TX:  NACE).

28. ASTM PCN: 03-401079-14, “Manual of Coating Work for Light-Water Nuclear Power Plant Primary Containment and Other Safety-Related Facilities” (West Conshohocken, PA: ASTM, 1979), pp. 114-119.

29. H.H. Baker, R.G. Posgay, “The Relationship Between Concrete Cure and Surface Preparation,” JPCL 8, 8 (1991): pp. 50-56.

30. F. Hazen, “Repairing Concrete Prior to Lining Second­ary Containment Structures,” JPCL 8, 1 (1991):  pp. 73-79.

31. ASTM PCN: 03-401079-14, “Manual of Coating Work for Light-Water Nuclear Power Plant Primary Containment and Other Safety-Related Facilities” (West Conshohocken, PA: ASTM, 1979), pp. 120-123.

32. C.T. Grimm, “Cleaning Masonry:  A Review of the Liter­ature,” Publication #TR 2-88, Construction Research Cen­ter, (Arlington, TX:  University of Texas at Arlington, Novem­ber 1988).

33. S. Lefkowitz, “Controlled Decontamination of Con­crete,” Concrete: Surface Preparation, Coating and Lining, and Inspection (Houston, TX:  NACE, 1991).

34. R.A. Nixon, “Assessing the Deterioration of Concrete in Pulp and Paper Mills,” Concrete:  Surface Preparation, Coating and Lining, and Inspection, January 28-30, 1991 (Houston, TX:  NACE, 1991).

35. IS214 (latest revision), “Removing Stains and Cleaning Concrete Surfaces,” (Skokie, IL: PCA).

36. J. Steele, “Testing Adhesion of Coatings Applied to Concrete,” Materials Performance (MP) 33, 11 (1994):  pp. 33-36.

37. ASTM D 4541 (latest revision), “Standard Test Method for Pull-Off Strength of Coatings Using Portable Adhesion Testers” (West Conshohocken, PA:  ASTM).

38. ACI 503R (latest revision), “Use of Epoxy Compounds with Concrete” (Farmington Hills, MI:  ACI).

39. T.K. Greenfield, “Dehumidification Equipment Reduces Moisture in Concrete During Coating Application,” MP 33, 3 (1994):  pp. 39-40.

40. L. Harriman, “Drying and Measuring Moisture in Concrete—Part I,” MP 34, 1 (1995):      pp. 34-36. November 13-18, 1993 (Pittsburgh, PA:  SSPC, 1993), pp. 144-147.     t

41. L. Harriman, “Drying and Measuring Moisture in Conions for Preserving and Protecting Industrial Structures,

crete—Part II,” MP 34, 2 (1995):      pp. 34-36. 46. K. Pashina, “Planning, Proper Surface Preparation Essential for Successful Coatings,” Concrete Repair Bulletin

42. W.H. Riesterer, “Hydrostatic, Capillary, Osmotic and 7, 1 (1994):  pp. 4-8. Other Pressures,” Innovations for Preserving and Protecting Industrial Structures,” November 13-18, 1993 (Pittsburgh, 47. ASTM PCN: 03-401079-14, “Manual of Coating Work PA: SSPC, 1993).  for Light-Water Nuclear Power Plant Primary Containment and Other Safety-Related Facilities” (West Conshohocken,

43. ASTM E 1907 (latest revision), “Standard Practices for PA: ASTM, 1979), pp. 124-127.  Determining Moisture-Related Acceptability of Concrete Floors to Receive Moisture-Sensitive Finishes” (West Con-48. T.I. Aldinger, “Coating New Concrete:  Why Wait 28 shohocken, PA:  ASTM). Days?” SSPC 91-19:  Protective Coatings for Flooring and Other Concrete Surfaces, November 10-15, 1991 (Pitts­

44. N.C. Duvic, “Surface Preparation of Concrete for Appli-burgh, PA: SSPC, 1991), pp. 1-4. cation of Protective Surfacing or Coating,” Concrete: Sur­face Preparation, Coating and Lining, and Inspection (Hous-49. J. Steele, “Effective Sealing, Priming and Coating of ton, TX:  NACE, 1991). New and Uncured Concrete,” Concrete: Surface Prepara­tion, Coating and Lining, and Inspection, January 28-30,

45. P.J. Fritz, “The Use of Captive Shot (Roto-Peening) for 1991 (Houston, TX:  NACE, 1991). Preparing the Surface of Concrete,” SSPC 93-06:  Innova­

Joint Surface Preparation Standard SSPC-SP 13/NACE NO.06 – Surface Preparation of Concrete

Filed Under: Surface Preparation Tagged With: coating preparation, concrete surfaces, surface preparation

Primary Sidebar

Categories

  • Application Guidelines
  • Applying Rust Bullet
  • Australia
  • Automotive
  • Boats
  • Coating Failures
  • Concrete
  • Corrosion
  • Home & Farm
  • How it Works
  • Industrial
  • Lab Tests
  • Marine
  • MSDS & Data
  • New Zealand
  • Painting Systems
  • Paints and Coatings
  • Presentations
  • Press Releases
  • Product Comparisons
  • Project Videos
  • Projects
  • Qualification Procedures
  • Rust Bullet Testimonials & Reviews
  • Rust Prevention
  • Rust Protection
  • Rust Protection Articles
  • Rust Research
  • Ships
  • SSPC Standards
  • Surface Preparation
  • Technical
  • Technology Reports
  • Technology Updates
  • Types of Use
  • Uncategorized
  • Why Choose Rust Bullet

Recent Posts

  • Process of Corrosion Metal Corrosion Australia
  • Rust Inhibitor Paint Rust Prevention Corrosion Australia
  • Corrosion Protection Rust Paint Australia Automotive
  • Corrosion Prevention Rust Paint Applications Australia
  • Rust Inhibitor Australia

Archives

  • August 2025
  • June 2025
  • April 2025
  • February 2025
  • December 2024
  • October 2024
  • August 2023
  • May 2023
  • March 2023
  • January 2023
  • November 2022
  • September 2022
  • July 2022
  • May 2022
  • March 2022
  • December 2021
  • November 2021
  • September 2021
  • July 2021
  • May 2021
  • March 2021
  • January 2021
  • November 2020
  • September 2020
  • July 2020
  • May 2020
  • March 2020
  • January 2020
  • November 2019
  • September 2019
  • July 2019
  • April 2019
  • February 2019
  • December 2018
  • October 2018
  • July 2018
  • June 2018
  • March 2018
  • November 2017
  • September 2017
  • May 2017
  • March 2017
  • November 2016
  • August 2016
  • May 2016
  • February 2016
  • October 2015
  • July 2015
  • April 2015
  • March 2015
  • January 2015
  • December 2014
  • November 2014
  • July 2014
  • May 2014
  • March 2014
  • August 2010
  • July 2010
  • June 2010

Rust Bullet

A simple to apply, low maintenance rust inhibitor, protective coating with phenomenal adhesion.

  • Stop Rust Permanently

Rust Bullet Automotive

Stop rust permanently. Scientifically proven for rust prevention, rust proofing & rust removal

  • Stop Rust Permanently

Rust Bullet Black Shell

Designed specifically as the optimum top coat for Rust Bullet and Rust Bullet Automotive

  • Stop Rust Permanently

Rust Bullet Australasia

224 Mooloolaba Rd
Buderim, QLD 4556

Stephen : 0415 168 902

Email: info@rustbullet.com.au
Support: support@rustbullet.com.au
Sitemap

Home   Terms & Condition  
Privacy Policy   Rust Bullet on Facebook

Copyright © 2025 Rust Bullet Australia. All Rights Reserved.
Web Redesign by 1 2 Website